3 Meter VGA Cable D-Sub 15 Pin VGA SVGA PC to TFT LCD Monitor TV Long Lead UK

Category

Monitor/AV Cables & Adapters

Store

eBay

Brand

Unbranded/Generic

Supports resolutions at 800x600 (SVGA), 1024x768 (XGA), 1600x1200 (UXGA), 1080p (Full HD), 1920x1200 (WUXGA), and up for high resolution LCD and LED monitors. High performance VGA cable connects a VGA (Video Graphic Array) equipped computer to a monitor or projector with 15-pin VGA port (also known as RGB, DB-15, DE-15, HD-15, HDB-15 or D-sub 15) for video editing, gaming, or video projection.

2.75 GBP